Attention A T users. To access the menus on this page please perform the following steps. 1. Please switch auto forms mode to off. 2. Hit enter to expand a main menu option (Health, Benefits, etc). 3. To enter and activate the submenu links, hit the down arrow. You will now be able to tab or arrow up or down through the submenu options to access/activate the submenu links.

Coatesville Veterans Affairs Medical Center

 

Construction at the Coatesville VAMC

Coatesville VA Medical Center Facility Map

Planned Projects

Home Base Primary Care, Nutrition and Food Service, and Facilities Engineering (Building 58)

Building 58 Basement will be renovated to accommodate several services to include: Home Based Primary Care (HBPC), Nutrition and Food Service (NFS), and Facilities Engineering Service (FES). The renovation will include the demolition of a 20-year-old decommissioned bowling alley into an updated modern administrative area. Ultimately, the renovation will create a collaborative working environment for HBPC, NFS will have an improved area for food preparation and distribution, and FES will gain a new workshop for their mechanics, carpenters and locksmiths.

Construction completion for this project is estimated for 2019.

Outpatient Mental Health Clinics (Building 4)

The first and second floor of Building 4 will be renovated for new Mental Health Outpatient Clinics. Services will include Neuropsychology, Substance Abuse, Compensated Work Therapy and Mental Health Intensive Case Management. Renovations will focus on improving therapeutic environment for patients and family, service delivery and space efficiency.

Construction completion for this project is estimated for 2019.

Dental (Building 1)

The Dental Department will be relocating to the ground floor of Building 1, to increase the accessibility and efficiency of dental care delivery. The Dental Suite will be outfitted with state-of-the-art dental equipment to improve the department’s capabilities.

Construction completion for this project is estimated for beyond 2020.

 
Projects Initiated

Primary Care and Geriatric Patient Aligned Care Team (Building 2)

The Coatesville VAMC is currently modernizing the space for our foundational services, beginning with primary care. This renovation will bring Patient Aligned Care Team (PACT) design criteria to our primary care and geriatric PACT clinics and allow for greater collaboration and patient management by clinical staff while streamlining care delivery. We are excited to be the first in the VA to retrofit an "H" style building to accommodate space requirements for the PACT model. The ground floor of Building 2 (former urgent care space) will become the new home of our Geriatric PACT clinic. A new exterior tunnel hallway will be constructed in order to accommodate GeriPACT space requirements. The first floor, west end will be renovated to comply with Primary Care PACT requirements.

Construction completion for this project is estimated for 2019.

Infrastructure and Utility Upgrade Projects

  • Upgrade HVAC B/57 (Construction completion est. Spring 2019)
  • Update Exterior Signage & Wayfinding (Construction completion est. Fall 2019)
  • Correct Electrical Deficiencies - Phase 2 (Construction completion est. Winter 2019)
  • Replace Mechanical Rooms - Phase 1 (Construction completion est. Winter 2019)
  • Upgrade Telecommunications Infrastructure (Construction completion est. Spring 2020)
  • Renovation of Data Center and Facility Fiber Optics (Construction completion est. Summer 2020)
  • Replace Steam & Cond Oval 1 (Construction completion est. Fall 2020)
  • Tree Management & Sidewalk Oval 2 (Construction completion est. Spring 2021)
  • Upgrade HVAC B/38 (Construction completion est. Spring 2021)
  • Replace Water Mains & Valves (Construction completion est. Fall 2021)
 
Projects Completed

Delaware County Community Based Outpatient Clinic (CBOC) – Completed November 2018

On Monday, November 19, 2018, the Springfield CBOC relocated from the Crozer-Keystone Health System Complex to its new location in the Marville Center at 4883 West Chester Pike, Newtown Square, PA 19073. The clinic was also renamed the Delaware County VA Clinic. The new clinic is larger, offering approximately 9000 square feet providing the space needed to meet the increasing demand for health care services. The Delaware County CBOC offers services in primary care, mental health care, women's health care, social work services, home based primary care, telehealth, and laboratory. Click here to view progress photos and watch a short video about the new Community Based Outpatient Clinic.

Administrative Services (Building 9) – Completed January 2018

The newly renovated floor of Building 9 renovation provided new and expanded space for Human Resources, Finance, Primary Care Business Office, Consolidated Patient Account Center (CPAC) and the Canteen Business office. Renovations included infrastructure and utility upgrades to electrical, HVAC and telecommunications/information technology serving all three floors.

Physical Rehabilitation and Medicine Service (Building 69) – Completed October 2016

The renovated and expanded building of Physical Rehabilitation and Medicine Service (PM&R) offers a state-of-the-art environment, allowing all the PM&R services to be under one roof to better serve our Veterans. PM&R services include: Audiology, Kinesiotherapy, Occupational Therapy, Physical Therapy, Patient Gym, Physiatrists, Prosthetics Department and Therapy Pool.

Facility Emergency Power – Completed October 2015

Two diesel generators individually capable of providing complete facility emergency power were installed, tested and commissioned in October 2015. The generator installations provide redundant capabilities serving 40+ buildings and provides seamless service delivery for the medical center during inclement weather or unexpected public power interruptions.

Urgent Care/Specialty Clinic (Building 3) – Completed October 2014

Urgent care, diagnostic and specialty care building renovations were completed in October 2014. The scope of the renovation included complete demolition and reconstruction of two floors totaling 39,000 square feet. The first floor included expanded radiology services to include MRI and a new Urgent Care Suite. The seconf floor provides a "one-stop shop" for patient care needs to include podiatry, optometry, PACT outpatient clinics and laboratory service.